DIY Slab Verification Quick Start

Please enable JavaScript in your browser to complete this form.
Step 1: Getting StartedStep 1 of 3

🧰 DIY Concrete Slab Verification Kit

 

Thank you for ordering your DIY Kit from Oasis Engineering. This guide will walk you through how to use the equipment, collect required information, and submit everything for engineer review.

 

📦 What’s in the Box

  • Zircon MT-7 Metal Scanner (with battery pre-installed)
  • Spare 9V Battery
  • 25-ft Tape Measure
  • Oasis Marking Tape Squares (removable)
  • Mini Trowel Tool
  • Microfiber Cloth (for cleaning scanner after use)
  • Prepaid UPS Return Label
  • Quick-Start Guide & Submission Checklist (you’re reading it!)
  • AirTag Hidden in Equipment Case (for security)

 

🔎 Step-by-Step Instructions

  1. Unpack all equipment and make sure everything is included.
  2. Identify your slab edge — clear away any grass, mulch, or debris using the trowel tool.
  3. Use the tape measure to document exposed slab thickness. Snap a clear photo with the tape showing the depth.
  4. Power on the MT-7 scanner and scan slab areas to detect rebar or mesh.
  5. Use the tape squares to mark areas where rebar is detected. Snap photos with the tape visibly marking the spots.
  6. Complete the online submission form using the QR code provided in your email or visit oasisengineering.com/slab-upload
  7. Upload your photos, scan results, and answer the checklist questions.

 

📝 Submission Checklist

  • 📸 Photo of slab edge with measuring tape showing depth
  • 📸 At least 3 rebar scan locations marked with tape (photo required)
  • 📍 Site plan or sketch of where the structure is located on the slab
  • 📄 Any known details about slab thickness, pour date, or rebar spacing

 

📬 Equipment Return Instructions

Once you’ve uploaded your documentation:

  • Re-pack all items in the original case.
  • Apply the prepaid UPS return label to the box.
  • Drop off at any UPS location within 10 business days of delivery.
⚠️ Note: If equipment is not returned on time or is damaged, your full payment may be forfeited.
 

✅ What Happens Next

Once our engineering team receives your submission and reviews all materials:

  • If everything checks out ✅, we’ll issue your engineer-signed foundation certification letter.
  • If your slab doesn’t meet standards ❌, we’ll provide recommendations and your payment can be applied to a full engineer visit.
Still have questions?
Email us at info@oasisengineering.com or call (813) 694-8989.