In the complex and ever-evolving world of construction and building compliance, the expertise of an experienced engineering consultant can be invaluable. This case study highlights how Oasis Engineering’s in-depth knowledge of the Florida Building Code (FBC) and strategic consultation played a crucial role in resolving a challenging window installation situation for a contractor.

Background of the Project:

During a remodeling project, the contractor faced severe water damage within the walls. This unforeseen complication led to the removal and reinstallation of existing impact-rated windows, originally installed in 2003 as part of a house addition project.

damaged wall window replacement engineer consulting

Challenges Faced:

  • Severe Water Damage: Necessitated comprehensive wall and window treatment.
  • Regulatory Compliance: Ensuring that the reinstalled windows met the current Florida Building Code requirements.
  • Inspection Hurdles: The project failed the window installation inspection, with the inspector requesting proof of product approvals and compliance.

Expert Engineering Involvement:

Recognizing the complexities involved, the property owner reached out to our team for consultation and inspection verification. Our approach involved:

  • Detailed FBC Analysis: We conducted a thorough review of the Florida Building Code, particularly Section 406, which governs structural repairs.
  • Code Compliance Assurance: Ensured that the window reinstallation was incidental to the wall repairs and complied with FBC, specifically Sections 406.1 and 406.2.1.
  • Validation of Existing Installations: As per Florida Statute [F.S. 553.8425], we verified that the existing windows, installed under previous code standards, were still valid and compliant.
  • Technical Expertise in Window Installation: Provided verification on the correct reinstallation techniques, using the appropriate screws and clips, and ensuring proper waterproofing and insulation procedures.

Outcome and Impact:

  • Successful Compliance: The detailed analysis and compliance assurance provided by Oasis Engineering facilitated the passing of subsequent inspections. We provided certified engineering documentation for compliance approval.
  • Cost and Time Efficiency: Our intervention saved the contractor potential delays and additional costs associated with non-compliance.
  • Reaffirmation of Safety and Integrity: Ensured that the reinstalled windows were structurally sound and met HVHZ and impact missile standards. Moreover, the window design pressures are adequate with the wind load calculations.

This case study demonstrates the significant value that expert consulting and specific building code research can bring to a construction project. By partnering with our team, the contractor not only navigated the complexities of the FBC but also ensured the safety, compliance, and timely completion of the project.